How Long Does a Full Kitchen Renovation Take?
A full kitchen replacement takes six to eight weeks from strip out to snagging, and nine to twelve if services move or the room is stripped...
Every plan, schedule and permit note on the site, newest first.

A full kitchen replacement takes six to eight weeks from strip out to snagging, and nine to twelve if services move or the room is stripped...

Two metres of clear headroom measured vertically from the pitch line of the stair, and 1.9 metres at the lowest point over a sloping ceiling, with...

Yes. Removing a chimney breast is a structural alteration and needs building regulations approval, engineer calculations and usually a party wall notice. It also needs a...

Yes, provided a waste route can reach an existing stack or drain with a 1 in 40 to 1 in 80 fall and a run short...

A modern kitchen needs a minimum of four dedicated circuits: one for the cooking appliance, one for the refrigerator, one for small appliance outlets, and one...

Large format tile needs a cement-based, flexible, large-and-heavy-tile adhesive applied as a full bed with a 10mm notched trowel plus back-buttering, and a flexible grout with...

It depends on whether the roof volume changes and where the property sits. A rooflight conversion within the existing roof often falls under permitted development; a...

A full bathroom replacement takes three to five weeks from strip out to snagging, and six to eight if the layout moves or the room is...

An inspector checks four things in sequence: the excavation and foundations, the structure before it is closed, the services before they are covered, and the completed...